ICH Q1B Light Module Installation

This how-to video shows the physical installation of the ICH Q1B Light Module and the ICH Q1B Light Module with Quantum Control (LQC) on compatible BINDER chambers.

Follow the video to mount the light box, insert the light cassettes, guide the cables through the access port, and connect the module to the chamber.

Operating manual

Please use the operating manual as the main reference during installation.

  • ICH Q1B Light Module – Operating manual (available in the Download Center)

Complete the controller setup

After the physical installation, a controller data set update is required so that the installed light module is recognized by the chamber controller and all module functions become available. This step is required for both the ICH Q1B Light Module and the ICH Q1B Light Module with Quantum Control (LQC).

BINDER Service Solutions

With BINDER Service Solutions, you get the best out of your equipment: reliably, quickly and personally. Whether maintenance, calibration or support - we ensure that your processes run smoothly, and your equipment is always ready for use. The extra bonus for your success!

All BINDER services

 

Product registration

Register now

Installation

Read more

Maintenance

Read more

Calibration

Read more

Qualification

Read more

Request spare parts

Request now

Product questions

Ask now